Friday, November 16, 2007

Gas Valve Design

As you can tell if you have been reading these recent posts I'm working on gas valve design. We are going to need good control of very low flow rates. Very low. On the order of 1E-3 to 1E-6 cc/second at STP.

A gas valve with a major orifice .200" in diameter will not give us much control. It goes from fully on to fully off (at the very low flow rates required) with a travel of .1 thousandth of an inch. What can be done to increase the travel and also increase the flow control?

Angle the sealing plate (assuming a soft seal such as an O-ring). This will give more control as the valve comes closer to full off. It will also make the control algorithms trickier as the gain goes up with increased opening. An orifice plate in the vale would be a help in limiting maximum flow (gain) and it would help increase control in the proportional range by adding a flow resistance to the valve resistance.

It also looks like we will need a multi stage regulator. 20 psia (5 psig) to 5 torr. 5 torr to 1E-3 torr. And the final control stage of 1E-3 torr to 1E-7 torr. Individual stages for the experimental reactor should be able to vary pressures over at least a 10 to 1 range (100 to 1 is better) to account for required gas flow variations depending on operating pressure. Once we understand operation better we can optimize for actual flow requirements.

It looks like piezo electric benders are not going to work since the travel is much too small. Something on the order of 1 to 2 micro meters. What we need is something better. A voice coil motor. That can easily give +/- 30 thousandths of an inch travel. It has a drawback in that it is magnetic in nature and thus can't be placed inside the the magnetically shielded grids. For small reactors a 2 ft length tube will add about 2 mS delay to the control system. Not good. Not insurmountable.

As the reactors increase in size delay will go up linearly with size. This is bad. Volume will go up as the cube of size. This is good. More volume reduces the need for fast control.

In fact the whole gas system may need a number of reservoirs to make the control problems tractable. It is pretty much a truism in business these days that the faster the manufacturing system can respond to demand the smaller the required inventory. So it is with any control system. We will adjust our inventories accordingly.

Tuesday, November 13, 2007

Orifice Sizing

I have been mulling over the flow control problem for a small test reactor and I think I have at least a partial solution. First lets lay out the dimensions of the problem. Let us say that the reactor is a sphere with a diameter of .9 meter and a core diameter of .3 meter. The volume of a sphere is 4/3 π r3. A fair approximation for our work is 4 r3. So the volume of the outer sphere is 4 * (.45)3 = .36 m3. Minus the inner volume of 4 * (.15)3 = .014 m3 hardly worth worying about. So we won't. So we are at about .35E6 cm3 for volume.

Now how about pressure. We want to keep the pressure in that volume below 1E-7 torr. What is that in atmospheres? To help us along we have a handy pressure calculator. The answer is 1.3E-10 atmosphere. Times .35E6 cc. So it takes about 5E-5 cc at STP to fill the chamber.

Now it turns out that there is a dandy orifice company called Lenox Laser who appear to have just what we need. An orifice calculator. Let us set it up to fill our tank in one second. That should give us pressure control of better than 1% if we can get our valve to go from on to off in a millisecond. So we start with an inlet pressure of 1 torr to our control valve. The other side of the orifice will be at chamber pressure. 1E-7 torr. Since we are figuring this for Deuterium we will use He4 as a substitute for 2H2 (a Deuterium molecule). Use 273.15 Kelvin for the gas temperature. A flow rate of 5E-5 cc/sec. And we have an answer. 9.7 microns. Say 10 to make it even. A small orifice. Not the smallest (they go down to 1 micron).

From their catalog [pdf] you can scroll down to page 28 and find a nice 10 micron orifice that is drilled into a 1/4-28 set screw for under $100 bucks. Or if you get a disc from page 3 under $35.

Now of course we haven't taken into account any gas the turbo pumps are taking out or that is being burned up as the Deuteriums fuse (a minuscule amount) but at least we know what ball park we are in and at the lowest flow we are likely to want we can do the job. Now for that 1 torr regulator.

Update 1924z 19 Nov 007

We can look at some turbo pump estimates. Let us suppose we have 6 turbo pumps each capable of 3,000 l/s pumping speed. How much flow would be required? Let us look at the low end. That would be 18,000 l/sec or 1.8E6 cc/sec. If we start at 1E-7 torr that would be about .24E-3 cc/sec at STP. I have decided to have an intermediate regulator to get the gas pressure down to 1E-3 torr to the final regulator.

So what hole sizes do we need? Let us start with our original

Inlet to Outlet
1E-3 to 1E-7 torr 5.0E-5 cc/sec 40 microns

1E-3 to 1E-8 torr 2.4E-5 cc/sec   28 microns
1E-3 to 1E-7 torr 2.4E-4 cc/sec   87 microns
1E-3 to 1E-6 torr 2.4E-3 cc/sec 275 microns
1E-3 to 1E-5 torr 2.4E-2 cc/sec 870 microns